Estuary | Gellibrand River Estuary |
---|---|
Site | Gellibrand River Estuary Mouth Observation Site |
Observation ID | #10211 |
Date and Time | Saturday 12th March 2016 12:50pm |
Approved | Approved |
- estuary artificially opened at 13:00
- swash high up on beach.
- river very dark.
- more sand pushed into estuary around rocks.
- foam and algae removed by waves over berm during past few days.
- waves creating curved scoured area on the ocean side of the berm.
- excavation channel started at east side of estuary and curved toward the west. The channel is wide and shallow.
- flow after opening was steady. By 16:40 waves were travelling upstream.
- extremely large number of fish in shallow water near the start of the excavation channel.