Skip to content
 
EstuaryWatch Data Portal
Volunteer Login

Estuary event details

Estuary Barham River Estuary
Region Corangamite CMA
Event type Estuary Entrance Opening
Date and time 2 March 2019 09:15am
Description

23/02/2019 at 12.30 the Barham river mouth is closed and the estuary height is 1.03m.

27/02/2019 at 10.30 the estuary height is1.21m, the berm clearance is 0.1m and the Paradise river gauge is low and at 0.177m.

01/03/2019 at 17.30 the estuary height is 1.30m.

02/03/2019 at 09.15 the river mouth is open to smooth seas with a fresh N wind. The estuary height is 0.82m.

Low river flows have been a dominant factor in this seasons river mouth closures to this date.